While the snow may be causing chaos on the UK roads, work at KEYBEMO hasn't stopped with production continuing until Christmas Eve. The snow covered yard was quickly cleared in order to prevent any disruptions.
[gallery link="file"] read more
[gallery link="file"]
Installed By
Thomas Devon & Co Ltd
Completed
December 2009
Location
Glenrothes
Product
KB400/65 Natural Stucco Embossed Aluminium
read more
KEYBEMO have added a new energy efficent truck to the fleet. Utilizing the latest technology to ensure CO2 emissions are kept to a minimum, the truck adds to the companys enviornmental credentials and compliments KEYBEMO's use of 100% recycled aluminium.
The ...read more
[gallery link="file"]
Installed By
Barry Collen Ltd
Completed
December 2008
Location
Ratcliffe-On-Soar
Product
KB400/65 Natural Stucco Embossed Aluminium
read more
[gallery link="file"]
Installed By
J.F. Roofing Ltd
Completed
December 2008
Location
Chesterfield
Product
KB400/65 Natural Stucco Embossed Aluminium
Waveform Configuration
read more
EDS, an HP company, recently acquired a warehouse totalling approx 300,000 sq feet to be used as a high tech data centre. Because of the equipment going into the building, it was decided that a 2nd roof was to be installed ...read more








