Interbuild 2009 is now over and has been a complete success. KeyBEMO worked alongside LGSF Ltd (Light Gauge Steel Frame) in order to produce the steel structure on Sustainability Street. This structure was one of the more popular exhibits on display and ...read more
KeyBEMO were chosen to supply their Natural Stucco Embossed Standing Seam roofing for the new Chesterfield FC stadium. Based on the old Dema Glassworks the ground consist of 4 stands, the west stand housing the conference and banqueting rooms. The ...read more
The new Cardiff Central Library has achieved a BREEAM Excellent Rating through the re-use of an existing site and enhancements to local ecology. One of these enhancements being the nature roof installed on the KeyBEMO® Standing Seam roof system.
Installed by ...read more
Completed in September 2009 the design of Monkseaton High School provided new challenges for KeyBEMO®. The roof design comprised of differing curves in 4 directions, much like a lobster back. This required a new approach to roof sheet design and ...read more







